Project Overview

Construction and operation of a wind power plant with a total installed capacity of 4 MW in Khmelnytskyi region, Ukraine.

  • Project description

    The essence of the project is to purchase used wind turbines and transport them from Europe for subsequent installation and operation.

    The project involves the construction of a power plant with a capacity of 4 MW, consisting of two wind turbine units of 2 MW each.

    The generation will be carried out by two units using wind power.

    The project is planned to be implemented in several interconnected and parallel stages, namely: land management work, project development, preparatory work, construction work, acquisition, delivery, and installation of equipment, obtaining necessary permits and documentation, commissioning, and electricity generation.

    The commissioning is planned for the 3rd quarter of 2024.

  • Available documentation and calculations

    ● Pre-project/project documentation● Land plot documents● Design and cost estimate documentation● Feasibility study (FS)● Licenses, permits, database extracts, and legal documents● Financial statements of the project initiator● Contracts with equipment suppliers and consumers● Business and financial models● Business plan● Marketing and business strategies● Investment strategy● Investment project evaluation

  • Priority legal models for project implementation

    ● SPV (in the form of a joint-stock company/limited liability company)● Joint venture● Enterprise with foreign investments● Consortium

  • Investment models

    ● Debt capital: raising 40-70% of the project cost (€1.0 – €1.7 million) at an annual interest rate of 5-9% in the form of loans financed by funds or banking institutions.
    ● Grant funds: obtaining grants within the framework of resilience and recovery initiatives for Ukraine, particularly for grid connection costs, amounting to €567,500.

Financial metrics of the project

Source of refund to the investor:

cash flows from project implementation, project financing

Q3 2024

Start investing

1,49

Profitability Index (PI)

5 years

Payback period (PB)

20,58%

Internal rate of return (IRR)

143%

Investor ROI
(for a 10-year period)

up to 30%

Own funds of the project initiator

€2 474 852 

Investment volume

€1 610 617 

Net present value of the project (NPV)

01.06.24 - 30.08.24  

Financial closure of the project