Project Overview

Construction and operation of a mini-hydroelectric power station with a total installed capacity of 1,596,240 kW/year in the Lviv region, Ukraine.The average annual capacity of the station is 183 kW/h.

  • Project description

    The project aims to implement the construction and operation of 7 mini-hydroelectric power stations on rivers in the Lviv region, with a total installed capacity of 11,173,680 kW/year.
    Renewable sources are environmentally friendly and are gaining wide popularity in Ukraine.The activity aims to generate clean electricity through the energy of mountain river waters.
    The project is planned to be implemented in several stages, which are interconnected and carried out in parallel, namely: land management work, project development, feasibility studies, preparatory work, construction work, procurement, delivery and installation of equipment, obtaining necessary permits, commissioning of capacities, connection to the power grid, and the sale of electricity to customers.
    The commissioning is planned for the second quarter of 2025.

  • Available documentation and calculations

    ● Pre-project/project documentation
    ● Land plot documents
    ● Design and cost estimate documentation
    ● Feasibility study (FS)
    ● Licenses, permits, database extracts, and legal documents
    ● Financial statements of the project initiator
    ● Contracts with equipment suppliers and consumers
    ● Business and financial models
    ● Business plan
    ● Marketing and business strategies
    ● Investment strategy
    ● Investment project evaluation

  • Priority legal models for project implementation

    ● SPV (in the form of a joint-stock company/limited liability company)
    ● Joint venture
    ● Enterprise with foreign investments
    ● Consortium

  • Investment models

    ● Debt capital: project, banking, and investment loans, bridge loans, corporate, infrastructure bonds, private placement of bonds, and other types of debt capital.
    ● Equity capital: sale of a stake in the company, direct investment in capital in exchange for a share in the company, corporate financing, acquisition of shares in a joint-stock company, venture financing.
    ● Specialized investment instruments: shares of the corporate investment fund, mutual fund investment certificates (REIT), institutional investments, investor syndicates, and investment pools.

Financial metrics of the project

Source of refund to the investor:

cash flows from project implementation, project financing

Q3 2024

Start investing

2,61

Profitability Index (PI)

2,35 years

Payback period (PB)

20%

Internal rate of return (IRR)

425%

Investor ROI
(for a 10-year period)

up to 30%

Own funds of the project initiator

€400 000 

Investment volume(for the installation of one mini-HPP)

€644 578 

Net present value of the project (NPV)

Q3 - Q4  2024  

Financial closure of the project

Feasibility study

Project readiness level

Do you want to cooperate with us?